archpermits.com

MEP Drawings for Permits

Many permits now require separate mechanical, electrical and plumbing sheets rather than a note that work will be "per code". MEP drawings show what's being installed, how it's sized and how it fits around the structure, and a coordinated set avoids the field clashes that cause change orders.

We prepare MEP drawings for additions, ADUs, remodels, panel upgrades, tenant improvements, restaurants and new construction.

  • 3–7 days
  • 98% first-time approval
  • PE stamp in all 50 states
ArchPermits architectural, structural and MEP permit drawing services.

What's in your drawing set

  • Electrical plans with circuits, outlets, lighting and panel schedule
  • Electrical load calculations and service sizing
  • Plumbing layouts and riser diagrams with fixture counts
  • Water supply and drain, waste and vent sizing
  • HVAC layouts with equipment, ducts and registers
  • Heating and cooling load calculations
  • Energy compliance coordination
  • Clash coordination with architectural and structural sheets

When MEP drawings are usually required

  • Panel or service upgrades
  • New circuits for additions, ADUs or kitchens
  • New bathrooms or relocated fixtures
  • New or replaced HVAC systems
  • Commercial tenant improvements
  • Restaurant kitchens and exhaust hoods

How it works

  1. 01

    Send your project details

    Address, a sketch or photos, and what you want to build. We confirm your city's requirements before drawing.

  2. 02

    We draw and code-check

    Your set is drafted to your jurisdiction's adopted code and checked the way a plan reviewer would check it.

  3. 03

    You submit, we support

    You get a permit-ready set, and we respond to any plan-check comments until it's approved.

Drawings delivered in 3–7 days. City review time after submission depends on your jurisdiction.

Frequently asked questions

Do residential permits need MEP drawings?

It depends on the jurisdiction and scope. Many accept notes for small changes but require full plans for additions, ADUs, panel upgrades and new systems. We confirm what your city needs before drawing.

Do you do electrical load calculations?

Yes. Load calcs are often required for panel upgrades, ADUs and EV chargers, and we include them with the electrical plan.

Can you match MEP to another designer's drawings?

Yes. Send us your architectural set and we'll prepare MEP sheets that are coordinated with it.

Are your MEP drawings stamped?

Where your jurisdiction requires an engineer's seal on MEP sheets, we provide it.

Already have drawings that just need a seal? See our PE stamp & seal review.

Get your mep drawings started today

Permit-ready drawings in 3–7 days, checked against your city's code.